2606 54th Street, San Diego, CA 92105
Built in 1952
Site Acreage: 7.6 acres
844 Students
Ad hoc task force guiding principles were established to assist in developing educational facilities that:
- are the heart and soul of the community
- have parity of the physical facilities and structures
- improve student learning and achievement
- improve accountability
Site-Specific Bond Project List
The following needs were identified through a comprehensive planning process, which included input from school site representatives to cluster meetings, district departments and other assessment measures.
The language below will be included in the bond resolution:
Project Improvements to Support Student Learning and Instruction
- Install a wireless network (WIFI)
- Provide 21st century technology upgrades, including audiovisual projection capabilities for all students
- Provide performing arts space and other spaces needed for curriculum
School Improvements to Support Student Health, Safety and Security
- Provide campus-wide emergency communications system
- Install security lighting, as well as, increase vandalism and intrusion safeguards, including modifications to fencing
- Provide additional parking
- Install classroom heating, ventilation and air-conditioning systems
- Improve vehicular circulation
Projects to Improve School Accessibility, Code Compliance Upgrades
- Renovate existing restrooms
- Improve accessibility to all classrooms, labs, restrooms, and other school facilities to comply with accessibility regulations including ADA Title I & II
- Replace old portable classrooms with two-story permanent construction and include instructional support space and an art lab to meet district facilities standards
- Install three-compartment sink in kitchen
Major Building Systems Repair/Replacement
- Repair/replace deteriorating plumbing and sewer systems where required
- Replace aging wiring and upgrade electrical systems
- Repair/replace heating and ventilation systems as needed
- Replace deteriorated flooring as needed
- Repair/replace damaged or stained ceiling finishes as needed
- Repair/resurface worn and damaged concrete and asphalt paving where needed
- Repair/upgrade building interior/exterior finishes and fixtures, including windows, as needed
- Repair/replace/upgrade performance spaces/multipurpose rooms